Optical System
AssemblyStrobe pattern, Fresnel lens and light intensity management for night visibility. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Optical System parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | LED Driver | 1× | DC-DC converter and current regulator delivering constant-current supply to LEDs. |
| 2 | Strobe Timer | 1× | Programmable oscillator producing a flashing pattern (typically 0.5–2 Hz). |
| 3 | Fresnel Lens | 1× | Stepped acrylic lens focusing LED light into a narrow beam for extended range. |
| 4 | Light Diffuser | 1× | Frosted polycarbonate panel spreading the light cone for visibility at all bearings. |
| 5 | Anemometer Sensor | 1× | wind-activated dimming |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Optical System
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | LED Driver | navigation-buoy-led-driver | 1× | 1 | · | part |
| 2 | Strobe Timer | navigation-buoy-strobe-timer | 1× | 1 | · | part |
| 3 | Fresnel Lens | navigation-buoy-fresnel-lens | 1× | 1 | · | part |
| 4 | Light Diffuser | navigation-buoy-light-diffuser | 1× | 1 | · | part |
| 5 | Anemometer Sensor | navigation-buoy-anemometer-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the optical system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$80. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sunnyoptical.com ↗ | Ningbo, CN | Optics & camera modules | 1,000 pcs | 8–12 wks |
|
🇨🇳OFILM
ofilm.com ↗
|
Shenzhen, CN | Camera modules | 1,000 pcs | 8–12 wks |
| vvdntech.com ↗ | Gurugram, IN | Electronics & camera modules | 1,000 pcs | 8–12 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 8–12 wks |
| aactechnologies.com ↗ | Singapore | Acoustics & optics | 1,000 pcs | 8–12 wks |