HVAC Plant
AssemblyCentral air-conditioning plant maintaining slight overpressure in the accommodation to keep cargo vapour out. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for HVAC Plant
5 top-level lines as of r116475| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Air-Handling Unit | oil-tanker-ship-ahu | 3× | 3 | · | part |
| 2 | Coolant Pump | coolant-pump | 2× | 2 | · | part |
| 3 | Fan-Coil Unit | oil-tanker-ship-fan-coil | 40× | 40 | · | part |
| 4 | HVAC Duct Section | oil-tanker-ship-duct-section | 150× | 150 | · | part |
| 5 | Fastener Set | fastener-set | 240× | 240 | · | part |