Piping Systems
AssemblyCargo, ballast, fuel, cooling, inert-gas and fire mains, the largest pipe population on the ship given the cargo and crude-wash networks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Piping Systems parts and their functions
5 top-level parts · 71,000 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Pipe Spool | 9000× | Prefabricated spools beyond block outfitting |
| 2 | Pipe Flange | 18000× | Flange pairs at spool joints |
| 3 | O-Ring Set | 13000× | Flange gaskets and union seals |
| 4 | Pipe Valve | 5000× | Cargo, ballast and service valves |
| 5 | Pipe Hanger | 26000× | Pipe clamps and hanger fixings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Piping Systems
5 top-level lines · 5 rows shown · 71,000 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pipe Spool | oil-tanker-ship-pipe-spool | 9000× | 9,000 | · | part |
| 2 | Pipe Flange | oil-tanker-ship-pipe-flange | 18000× | 18,000 | · | part |
| 3 | O-Ring Set | oring-set | 13000× | 13,000 | · | part |
| 4 | Pipe Valve | oil-tanker-ship-pipe-valve | 5000× | 5,000 | · | part |
| 5 | Pipe Hanger | oil-tanker-ship-pipe-hanger | 26000× | 26,000 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the piping systems is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |