Package Winding
AssemblyThe grooved drum and traverse that wind the cleared yarn into a large cross-wound package ready for the next process. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Package Winding parts and their functions
4 top-level parts · 1,920 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Grooved Drum | 480× | Grooved winding drums |
| 2 | Package Cradle | 480× | Package cradles |
| 3 | Traverse Guide | 480× | Traverse guides |
| 4 | Waxing Unit | 480× | Waxing units |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Package Winding
4 top-level lines · 4 rows shown · 1,920 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Grooved Drum | open-end-spinning-machine-grooved-drum | 480× | 480 | · | part |
| 2 | Package Cradle | open-end-spinning-machine-package-cradle | 480× | 480 | · | part |
| 3 | Traverse Guide | open-end-spinning-machine-traverse | 480× | 480 | · | part |
| 4 | Waxing Unit | open-end-spinning-machine-waxing | 480× | 480 | · | part |
Where the package winding is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2–$500. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Inovance
inovance.com ↗
|
Shenzhen, CN | Drives & motion control | 500 units | 10–14 wks |
| sonacomstar.com ↗ | Gurugram, IN | EV driveline & motors | 500 units | 10–14 wks |
| broad-ocean.com ↗ | Zhongshan, CN | Electric motors | 500 units | 10–14 wks |
| nidec.com ↗ | Singapore | Motors, regional ops | 500 units | 10–14 wks |
| bosch.in ↗ | Bengaluru, IN | Automotive components | 500 units | 10–14 wks |