Plinth Frame
PartGalvanized base frame lifting compartments 100–150 mm above grade, clear of standing water and snow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Galvanized base frame lifting compartments 100–150 mm above grade, clear of standing water and snow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.