BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Pallet Handling

Assembly

The pallet feeder and pusher that slide a fresh production pallet under the mould and push the finished board out. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Pallet Handling parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Pallet Handling parts diagram: 1 pallet magazine, 2 pallet feeder, 3 board pusher, 4 roller track, 5 coil spring. 8 parts in 5 top-level items.
Pallet Handling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Pallet Magazine 1× Pallet magazine
2 Pallet Feeder 1× Pallet feeder arm
3 Board Pusher 1× Board pusher
4 Roller Track 1× Roller track
5 Coil Spring 4× Feeder return springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Pallet Handling

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Pallet Magazine paver-block-machine-pallet-magazine 1× 1 · part
2 Pallet Feeder paver-block-machine-pallet-feeder 1× 1 · part
3 Board Pusher paver-block-machine-pallet-pusher 1× 1 · part
4 Roller Track paver-block-machine-roller-track 1× 1 · part
5 Coil Spring coil-spring 4× 4 · part

Where the pallet handling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks