Accommodation
AssemblyQuarters, mess and hospital for ~100 crew and scientists on 90-day endurance, fitted from prefabricated cabin modules. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Accommodation parts and their functions
6 top-level parts · 11,797 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cabin Module 2 parts | 60× | Prefabricated cabins with wet units |
| 2 | Galley Block | 1× | Galley and provision-handling block |
| 3 | HVAC Air Handler | 6× | Air handlers sized for −40 °C outside air |
| 4 | Fire Door | 90× | A and B class fire doors |
| 5 | Corridor Lining Panel | 700× | Corridor and deckhead lining panels |
| 6 | Fastener Set | 800× | Joiner and insulation fixing groups |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Accommodation
6 top-level lines · 8 rows shown · 11,797 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabin Module 2 parts | pib-cabin-module | 60× | 60 | 170 | assembly |
| 1.1 | Joiner Panel | pib-joiner-panel | 20× | 1,200 | · | part |
| 1.2 | Cabin Fitting | pib-cabin-fitting | 150× | 9,000 | · | part |
| 2 | Galley Block | pib-galley | 1× | 1 | · | part |
| 3 | HVAC Air Handler | pib-hvac-unit | 6× | 6 | · | part |
| 4 | Fire Door | pib-fire-door | 90× | 90 | · | part |
| 5 | Corridor Lining Panel | pib-corridor-panel | 700× | 700 | · | part |
| 6 | Fastener Set | fastener-set | 800× | 800 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the accommodation is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |