BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Insert and Release Tooling

Assembly

Jigs that place lifting anchors and the release agent gear that lets the panel part from the steel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Insert and Release Tooling parts and their functions

5 top-level parts · 14 parts in total · full bill of materials below
Insert and Release Tooling parts diagram: 1 insert setting jig, 2 recess former, 3 release agent sprayer, 4 demolding bar, 5 bed cleaning scraper. 14 parts in 5 top-level items.
Insert and Release Tooling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Insert Setting Jig 2× Lifting insert setting jigs
2 Recess Former 8× Recess and chamfer formers
3 Release Agent Sprayer 1× Release agent sprayer
4 Demolding Bar 2× Demolding pry bars
5 Bed Cleaning Scraper 1× Bed cleaning scraper set

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Insert and Release Tooling

5 top-level lines · 5 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Insert Setting Jig precast-concrete-mold-insert-jig 2× 2 · part
2 Recess Former precast-concrete-mold-magnet-recess 8× 8 · part
3 Release Agent Sprayer precast-concrete-mold-release-sprayer 1× 1 · part
4 Demolding Bar precast-concrete-mold-demold-bar 2× 2 · part
5 Bed Cleaning Scraper precast-concrete-mold-cleaning-tool 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the insert and release tooling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks