BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Deckhouse & Wheelhouse

Assembly

Crew accommodation topped by an elevated wheelhouse with the helm console and the all-around visibility needed to see over the tow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Deckhouse & Wheelhouse parts and their functions

6 top-level parts · 234 parts in total · full bill of materials below
Deckhouse & Wheelhouse parts diagram: 1 superstructure, 2 elevated wheelhouse, 3 helm console, 4 navigation suite, 5 crew cabin module, 6 wheelhouse window. 234 parts in 6 assemblies.
Deckhouse & Wheelhouse parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Superstructure
2 Elevated Wheelhouse Elevated/raisable
3 Helm Console 6 parts
4 Navigation Suite 5 parts
5 Crew Cabin Module
6 Wheelhouse Window 12×

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Deckhouse & Wheelhouse

6 top-level lines · 17 rows shown · 234 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Superstructure pusher-tugboat-superstructure 1 · part
2 Elevated Wheelhouse pusher-tugboat-wheelhouse 1 · part
3 Helm Console 6 parts pusher-tugboat-helm-console 1 209 assembly
3.1 Bare PCB pcb-bare 2 · part
3.2 Microcontroller mcu 2 · part
3.3 LCD Panel lcd-panel 2 · part
3.4 Engine Throttle Control pusher-tugboat-throttle-control 2 · part
3.5 Steering Lever pusher-tugboat-steering-lever 1 · part
3.6 SMD Passive (R/C/L) smd-passives 200× 200 · part
4 Navigation Suite 5 parts pusher-tugboat-navigation-suite 1 7 assembly
4.1 Radar Scanner pusher-tugboat-radar 1 · part
4.2 GPS Compass pusher-tugboat-gps-compass 1 · part
4.3 VHF Radio pusher-tugboat-vhf-radio 2 · part
4.4 Electronic Chart Display pusher-tugboat-ecdis 1 · part
4.5 Searchlight pusher-tugboat-searchlight 2 · part
5 Crew Cabin Module pusher-tugboat-crew-cabin 4 · part
6 Wheelhouse Window pusher-tugboat-window 12× 12 · part

Where the deckhouse & wheelhouse is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $10–$400. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳MRF
mrftyres.com ↗
Chennai, IN Tyres 500 pcs 4–8 wks
🇮🇳Apollo Tyres
apollotyres.com ↗
Gurugram, IN Tyres 500 pcs 4–8 wks
linglong.cn ↗ Zhaoyuan, CN Tyres 500 pcs 4–8 wks
🇮🇳CEAT
ceat.com ↗
Mumbai, IN Tyres 500 pcs 4–8 wks
🇨🇳Sailun
sailungroup.com ↗
Qingdao, CN Tyres 500 pcs 4–8 wks