BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Systems

Assembly

Purchase systems shaping the rig. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Systems parts and their functions

6 top-level parts · 14 parts in total · full bill of materials below
Control Systems parts diagram: 1 kicker (vang), 2 cunningham, 3 outhaul, 4 traveller, 5 block, 6 cam cleat. 14 parts in 6 top-level items.
Control Systems parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Kicker (Vang) 1× Purchase pulling the boom down to flatten the main.
2 Cunningham 1× Downhaul tensioning the mainsail luff.
3 Outhaul 1× Control tensioning the foot of the mainsail.
4 Traveller 1× Track setting the mainsheet lead athwartships.
5 Block 6× Pulley redirecting a control line.
6 Cam Cleat 4× Spring jaw locking a line under load.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Systems

6 top-level lines · 6 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Kicker (Vang) racing-dinghy-kicker 1× 1 · part
2 Cunningham racing-dinghy-cunningham 1× 1 · part
3 Outhaul racing-dinghy-outhaul 1× 1 · part
4 Traveller racing-dinghy-traveller 1× 1 · part
5 Block racing-dinghy-block 6× 6 · part
6 Cam Cleat racing-dinghy-cam-cleat 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the control systems is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks