BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Rig

Assembly

Mast, boom and standing rigging. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Rig parts and their functions

6 top-level parts · 8 parts in total · full bill of materials below
Rig parts diagram: 1 mast, 2 boom, 3 spreader, 4 shroud, 5 forestay, 6 mast step. 8 parts in 6 top-level items.
Rig parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mast 1× Tapered alloy or carbon spar carrying the mainsail.
2 Boom 1× Horizontal spar tensioning the foot of the mainsail.
3 Spreader 2× Strut spreading the shrouds to control mast bend.
4 Shroud 2× Side wire staying the mast.
5 Forestay 1× Forward wire staying the mast and carrying the jib luff.
6 Mast Step 1× Fitting locating the mast foot.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Rig

6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mast racing-dinghy-mast 1× 1 · part
2 Boom racing-dinghy-boom 1× 1 · part
3 Spreader racing-dinghy-spreader 2× 2 · part
4 Shroud racing-dinghy-shroud 2× 2 · part
5 Forestay racing-dinghy-forestay 1× 1 · part
6 Mast Step racing-dinghy-mast-step 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the rig is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks