Running Rigging
AssemblyHalyards and sheets controlling sail set. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Running Rigging parts and their functions
7 top-level parts · 21 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Halyard | 1× | Line hoisting the mainsail. |
| 2 | Jib Halyard | 1× | Line hoisting and tensioning the jib. |
| 3 | Mainsheet | 1× | Line trimming the mainsail angle. |
| 4 | Jib Sheet | 2× | Line trimming the jib. |
| 5 | Spinnaker Sheet | 2× | Line trimming the spinnaker clew. |
| 6 | Block | 8× | Pulley redirecting a control line. |
| 7 | Cam Cleat | 6× | Spring jaw locking a line under load. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Running Rigging
7 top-level lines · 7 rows shown · 21 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Halyard | racing-dinghy-main-halyard | 1× | 1 | · | part |
| 2 | Jib Halyard | racing-dinghy-jib-halyard | 1× | 1 | · | part |
| 3 | Mainsheet | racing-dinghy-mainsheet | 1× | 1 | · | part |
| 4 | Jib Sheet | racing-dinghy-jib-sheet | 2× | 2 | · | part |
| 5 | Spinnaker Sheet | racing-dinghy-spinnaker-sheet | 2× | 2 | · | part |
| 6 | Block | racing-dinghy-block | 8× | 8 | · | part |
| 7 | Cam Cleat | racing-dinghy-cam-cleat | 6× | 6 | · | part |
Where the running rigging is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |