Controlled-Atmosphere System
AssemblyA gas system lowering oxygen and raising carbon dioxide in the gastight holds so fruit ripens more slowly, extending the carriage life of bananas, apples and avocados beyond plain refrigeration. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Controlled-Atmosphere System parts and their functions
6 top-level parts · 40 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Nitrogen Generator | 1× | Nitrogen generator |
| 2 | CO2 Scrubber | 1× | Carbon dioxide scrubber |
| 3 | Air Compressor | 2× | Feed-air compressors |
| 4 | Gas Analyser | 4× | O2 and CO2 hold analysers |
| 5 | CA Valve | 24× | Hold gas line valves |
| 6 | Pressure Sensor | 8× | Gas line pressure |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Controlled-Atmosphere System
6 top-level lines · 6 rows shown · 40 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Nitrogen Generator | reefer-ship-n2-generator | 1× | 1 | · | part |
| 2 | CO2 Scrubber | reefer-ship-co2-scrubber | 1× | 1 | · | part |
| 3 | Air Compressor | reefer-ship-air-compressor | 2× | 2 | · | part |
| 4 | Gas Analyser | reefer-ship-gas-analyzer | 4× | 4 | · | part |
| 5 | CA Valve | reefer-ship-ca-valve | 24× | 24 | · | part |
| 6 | Pressure Sensor | pressure-sensor | 8× | 8 | · | part |
Where the controlled-atmosphere system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |