BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Deck & Console

Assembly

Self-draining deck and helm console. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Deck & Console parts and their functions

6 top-level parts · 13 parts in total · full bill of materials below
Deck & Console parts diagram: 1 deck sole, 2 console shell, 3 jockey seat, 4 grab rail, 5 scupper, 6 fastener set. 13 parts in 6 assemblies.
Deck & Console parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Deck Sole Bonded self-draining cockpit floor.
2 Console Shell Molded helm station and windscreen mount.
3 Jockey Seat Straddle seat absorbing shock at speed.
4 Grab Rail Stainless handhold for crew at speed.
5 Scupper Drain port clearing water off the deck.
6 Fastener Set Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Deck & Console

6 top-level lines · 6 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Deck Sole rib-deck-sole 1 · part
2 Console Shell rib-console-shell 1 · part
3 Jockey Seat rib-jockey-seat 2 · part
4 Grab Rail rib-grab-rail 4 · part
5 Scupper rib-scupper 4 · part
6 Fastener Set fastener-set 1 · part

Where the deck & console is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks