BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Deck Hardware

Assembly

Mooring, towing and safety fittings. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Deck Hardware parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Deck Hardware parts diagram: 1 cleat, 2 bow eye, 3 anchor, 4 anchor rode, 5 lifeline, 6 bilge pump. 9 parts in 6 top-level items.
Deck Hardware parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cleat 4× Mooring fitting securing dock lines.
2 Bow Eye 1× Towing and trailer-winch eye at the bow.
3 Anchor 1× Folding or plough anchor.
4 Anchor Rode 1× Chain and rope linking anchor to boat.
5 Lifeline 1× Grab line running around the tubes.
6 Bilge Pump 1× Electric pump clearing water from the bilge.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Deck Hardware

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cleat rib-cleat 4× 4 · part
2 Bow Eye rib-bow-eye 1× 1 · part
3 Anchor rib-anchor 1× 1 · part
4 Anchor Rode rib-anchor-rode 1× 1 · part
5 Lifeline rib-lifeline 1× 1 · part
6 Bilge Pump rib-bilge-pump 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the deck hardware is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks