BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Latch and Lock

Assembly

Slam latch operable from inside and outside, with padlock provisions both sides and an optional keyed cylinder. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Latch and Lock parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Latch and Lock parts diagram: 1 slam latch, 2 inside handle, 3 outside handle, 4 padlock hasp, 5 strike plate, 6 coil spring. 7 parts in 6 top-level items.
Latch and Lock parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Slam Latch 1× Spring bolt
2 Inside Handle 1× Egress handle
3 Outside Handle 1× Roof-side handle
4 Padlock Hasp 2× Inside + outside hasps
5 Strike Plate 1× Curb keeper
6 Coil Spring 1× Latch return

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Latch and Lock

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Slam Latch roof-hatch-slam-latch 1× 1 · part
2 Inside Handle roof-hatch-inside-handle 1× 1 · part
3 Outside Handle roof-hatch-outside-handle 1× 1 · part
4 Padlock Hasp roof-hatch-padlock-hasp 2× 2 · part
5 Strike Plate roof-hatch-strike-plate 1× 1 · part
6 Coil Spring coil-spring 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the latch and lock is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks