BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Enclosure

Assembly

NEMA 4 stainless or powder-coated steel cabinet housing controller and power distribution. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Enclosure parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Control Enclosure parts diagram: 1 enclosure cabinet, 2 cooling fan, 3 terminal block, 4 fastener set. 6 parts in 4 top-level items.
Control Enclosure parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Enclosure Cabinet 1× 400 mm W × 300 mm H × 200 mm D steel box
2 Cooling Fan 1× Thermostat-controlled ventilation
3 Terminal Block 3× DIN-rail terminal strips
4 Fastener Set 1× M5 bolts, washers, lock nuts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Enclosure

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Enclosure Cabinet scenery-automation-winch-enclosure-box 1× 1 · part
2 Cooling Fan scenery-automation-winch-cooling-fan 1× 1 · part
3 Terminal Block scenery-automation-winch-terminal-block 3× 3 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the control enclosure is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks