BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Dial and Transfer

Assembly

The horizontal dial of needles that makes rib and welts and transfers loops to the cylinder for shaping. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Dial and Transfer parts and their functions

4 top-level parts · 405 parts in total · full bill of materials below
Dial and Transfer parts diagram: 1 dial body, 2 dial needle, 3 dial cam, 4 transfer jack. 405 parts in 4 top-level items.
Dial and Transfer parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Dial Body 1× Dial body
2 Dial Needle 200× Dial needles
3 Dial Cam 4× Dial cams
4 Transfer Jack 200× Transfer jacks

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Dial and Transfer

4 top-level lines · 4 rows shown · 405 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Dial Body seamless-knitting-machine-dial-body 1× 1 · part
2 Dial Needle seamless-knitting-machine-dial-needle 200× 200 · part
3 Dial Cam seamless-knitting-machine-dial-cam 4× 4 · part
4 Transfer Jack seamless-knitting-machine-transfer-jack 200× 200 · part

Where the dial and transfer is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks