Leveling and Plumb Kit
AssemblyInstruments and shims the crew use to set the tower plumb and the deck to grade before a pour. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Leveling and Plumb Kit
4 top-level lines as of r154318| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Spirit Level | shoring-prop-system-spirit-level | 2× | 2 | · | part |
| 2 | Plumb Bob | shoring-prop-system-plumb-bob | 2× | 2 | · | part |
| 3 | Shim Set | shoring-prop-system-shim-set | 1× | 1 | · | part |
| 4 | Leg Load Monitor 6 parts | shoring-prop-system-load-monitor | 1× | 1 | 0 | assembly |