BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r154306 of this page, not the current version. Go to current · history

Secondary Joists and Deck

Assembly

Joists laid across the primary beams that carry the formwork deck and spread the wet concrete load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Secondary Joists and Deck

4 top-level lines as of r154306
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Secondary Joist shoring-prop-system-joist 12× 12 · part
2 Formwork Deck 3 parts shoring-prop-system-deck-panel 1× 1 0 assembly
3 Joist Clip shoring-prop-system-joist-clip 24× 24 · part
4 Edge Guard Board shoring-prop-system-edge-board 4× 4 · part