Secondary Joists and Deck
AssemblyJoists laid across the primary beams that carry the formwork deck and spread the wet concrete load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Secondary Joists and Deck
4 top-level lines as of r154306| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Secondary Joist | shoring-prop-system-joist | 12× | 12 | · | part |
| 2 | Formwork Deck 3 parts | shoring-prop-system-deck-panel | 1× | 1 | 0 | assembly |
| 3 | Joist Clip | shoring-prop-system-joist-clip | 24× | 24 | · | part |
| 4 | Edge Guard Board | shoring-prop-system-edge-board | 4× | 4 | · | part |