BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r154274 of this page, not the current version. Go to current · history

Vertical Standard

Assembly

Load-bearing leg tube that carries the axial falsework load down to the base jack. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Vertical Standard

5 top-level lines as of r154274
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Standard Tube shoring-prop-system-standard-tube 1× 1 · part
2 Cup Node shoring-prop-system-cup-node 4× 4 · part
3 Spigot Pin shoring-prop-system-spigot-pin 1× 1 · part
4 Spigot Sleeve shoring-prop-system-spigot-sleeve 1× 1 · part
5 Tube End Cap shoring-prop-system-end-cap 1× 1 · part