BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Rapier Insertion

Assembly

The two rapiers that hand the weft across the shed, one giving and one taking at the centre. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Rapier Insertion parts and their functions

6 top-level parts · 8 parts in total · full bill of materials below
Rapier Insertion parts diagram: 1 giver rapier, 2 taker rapier, 3 drive tape, 4 drive wheel, 5 rapier guide, 6 transfer cam. 8 parts in 6 top-level items.
Rapier Insertion parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Giver Rapier 1× Giver rapier
2 Taker Rapier 1× Taker rapier
3 Drive Tape 2× Drive tapes
4 Drive Wheel 2× Drive wheels
5 Rapier Guide 1× Rapier guide
6 Transfer Cam 1× Transfer cam

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Rapier Insertion

6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Giver Rapier shuttleless-loom-giver-rapier 1× 1 · part
2 Taker Rapier shuttleless-loom-taker-rapier 1× 1 · part
3 Drive Tape shuttleless-loom-rapier-tape 2× 2 · part
4 Drive Wheel shuttleless-loom-rapier-wheel 2× 2 · part
5 Rapier Guide shuttleless-loom-rapier-guide 1× 1 · part
6 Transfer Cam shuttleless-loom-transfer-cam 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the rapier insertion is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks