BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Cloth Take-up

Assembly

The driven rollers that advance the cloth and wind it onto the roll. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cloth Take-up parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Cloth Take-up parts diagram: 1 take-up roller, 2 emery roller, 3 cloth roll, 4 take-up servo, 5 helical gear pair. 5 parts in 5 top-level items.
Cloth Take-up parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Take-up Roller 1× Take-up roller
2 Emery Roller 1× Emery roller
3 Cloth Roll 1× Cloth roll
4 Take-up Servo 1× Take-up servo
5 Helical Gear Pair 1× Take-up gears

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cloth Take-up

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Take-up Roller shuttleless-loom-take-up-roller 1× 1 · part
2 Emery Roller shuttleless-loom-emery-roller 1× 1 · part
3 Cloth Roll shuttleless-loom-cloth-roll 1× 1 · part
4 Take-up Servo shuttleless-loom-takeup-motor 1× 1 · part
5 Helical Gear Pair gear-pair 1× 1 · part

Where the cloth take-up is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks