BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Galley & Mess

Assembly

Galley and mess feeding the crew through trips of several weeks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Galley & Mess parts and their functions

3 top-level parts · 94 parts in total · full bill of materials below
Galley & Mess parts diagram: 1 heating element, 2 sheet metal panel, 3 fastener set. 94 parts in 3 assemblies.
Galley & Mess parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Heating Element Resistance wire or ribbon in a metal sheath or ceramic carrier that converts electric current into heat.
2 Sheet Metal Panel 12× Flat or folded sheet-metal panel, cut and bent to shape, that forms the enclosure, guards, or skin of a machine.
3 Fastener Set 80× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Galley & Mess

3 top-level lines · 3 rows shown · 94 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Heating Element heating-element 2 · part
2 Sheet Metal Panel sheet-panel 12× 12 · part
3 Fastener Set fastener-set 80× 80 · part

Where the galley & mess is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks