BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Shedding Mechanism

Assembly

The dobby and frames that separately control ground and pile warp sheets each pick. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Shedding Mechanism parts and their functions

5 top-level parts · 41 parts in total · full bill of materials below
Shedding Mechanism parts diagram: 1 electronic dobby, 2 heald frame, 3 heddle wire, 4 coil spring, 5 helical gear pair. 41 parts in 5 top-level items.
Shedding Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Electronic Dobby 3 parts 1× Electronic dobby
2 Heald Frame 12× Heald frames
3 Heddle Wire 1× Heddle wires
4 Coil Spring 12× Frame springs
5 Helical Gear Pair 1× Dobby drive gears

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Shedding Mechanism

5 top-level lines · 8 rows shown · 41 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Electronic Dobby 3 parts terry-towel-loom-dobby 1× 1 15 assembly
1.1 Selection Solenoid terry-towel-loom-dobby-solenoid 12× 12 · part
1.2 Lifting Knife terry-towel-loom-dobby-knife 2× 2 · part
1.3 Bare PCB pcb-bare 1× 1 · part
2 Heald Frame terry-towel-loom-heald-frame 12× 12 · part
3 Heddle Wire terry-towel-loom-heddle 1× 1 · part
4 Coil Spring coil-spring 12× 12 · part
5 Helical Gear Pair gear-pair 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the shedding mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks