Accommodation
AssemblyBerths, a compact galley and a head fitted in the main hull. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Accommodation parts and their functions
4 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Berth | 3× | Built-in sleeping berth with foam cushion in the vaka. |
| 2 | Galley 3 parts | 1× | Compact cooking and washing station in the main hull. |
| 3 | Head 2 parts | 1× | Compact heads compartment in the main hull. |
| 4 | Fresh-Water Tank | 1× | Flexible or rigid potable-water tank in the vaka bilge. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Accommodation
4 top-level lines · 9 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Berth | trimaran-boat-berth | 3× | 3 | · | part |
| 2 | Galley 3 parts | trimaran-boat-galley | 1× | 1 | 3 | assembly |
| 2.1 | Galley Stove | trimaran-boat-stove | 1× | 1 | · | part |
| 2.2 | Galley Sink | trimaran-boat-sink | 1× | 1 | · | part |
| 2.3 | Cool Box | trimaran-boat-cooler | 1× | 1 | · | part |
| 3 | Head 2 parts | trimaran-boat-head | 1× | 1 | 2 | assembly |
| 3.1 | Marine Toilet | trimaran-boat-toilet | 1× | 1 | · | part |
| 3.2 | Holding Tank | trimaran-boat-holding-tank | 1× | 1 | · | part |
| 4 | Fresh-Water Tank | trimaran-boat-water-tank | 1× | 1 | · | part |
Where the accommodation is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |