AssemblyCantilever deck and handrails hung off the form so crews can work and pour safely at the slab edge. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Working Platform
6 top-level lines as of r178038| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Platform Deck | tunnel-formwork-platform-deck | 2× | 2 | · | part |
| 2 | Cantilever Arm | tunnel-formwork-cantilever-arm | 4× | 4 | · | part |
| 3 | Handrail | tunnel-formwork-handrail | 6× | 6 | · | part |
| 4 | Toe Board | tunnel-formwork-toe-board | 4× | 4 | · | part |
| 5 | Access Ladder | tunnel-formwork-access-ladder | 1× | 1 | · | part |