BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Machine Frame & Guards

Assembly

The welded frame that carries two rows of spindles back to back along the machine, the spindle rails, the take-up rails above them, and the guards over the running belt and spindles. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Machine Frame & Guards parts and their functions

5 top-level parts · 39 parts in total · full bill of materials below
Machine Frame & Guards parts diagram: 1 welded base frame, 2 spindle rail, 3 take-up rail, 4 spindle guard, 5 sheet metal panel. 39 parts in 5 top-level items.
Machine Frame & Guards parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Welded Base Frame 1× Welded base frame
2 Spindle Rail 4× Spindle rails
3 Take-Up Rail 4× Take-up rails
4 Spindle Guard 20× Spindle guards
5 Sheet Metal Panel 10× Frame cladding panels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Machine Frame & Guards

5 top-level lines · 5 rows shown · 39 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Welded Base Frame two-for-one-twister-base-frame 1× 1 · part
2 Spindle Rail two-for-one-twister-spindle-rail 4× 4 · part
3 Take-Up Rail two-for-one-twister-take-up-rail 4× 4 · part
4 Spindle Guard two-for-one-twister-guard 20× 20 · part
5 Sheet Metal Panel sheet-panel 10× 10 · part

Something wrong in this list? Report a problem with this BOM.

Where the machine frame & guards is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks