Yarn Tension & Guide Unit
AssemblyThe top guide and tensioner that sit on the spindle axis above the pot. The yarn comes up out of the balloon, through the centre guide, and the tensioner sets the running tension that decides how full and how even the take-up package builds. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Yarn Tension & Guide Unit parts and their functions
4 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Spindle-Axis Top Guide | 1× | Spindle-axis top guide |
| 2 | Yarn Tensioner | 1× | Yarn tensioner |
| 3 | Ceramic Thread Eyelet | 2× | Ceramic thread eyelets |
| 4 | Yarn Break Stop-Motion | 1× | Yarn break stop-motion |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Yarn Tension & Guide Unit
4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Spindle-Axis Top Guide | two-for-one-twister-top-guide | 1× | 1 | · | part |
| 2 | Yarn Tensioner | two-for-one-twister-tensioner | 1× | 1 | · | part |
| 3 | Ceramic Thread Eyelet | two-for-one-twister-thread-eyelet | 2× | 2 | · | part |
| 4 | Yarn Break Stop-Motion | two-for-one-twister-stop-motion | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the yarn tension & guide unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |