BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Lift Platform Assembly

Assembly

Modular deck and frame rising through stage floor opening, supporting actors and scenery. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lift Platform Assembly parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Lift Platform Assembly parts diagram: 1 platform frame, 2 platform deck, 3 side safety guard, 4 rail attachment bracket. 7 parts in 4 top-level items.
Lift Platform Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Platform Frame 1× Welded steel box structure, 2–4 m × 2–4 m footprint
2 Platform Deck 1× Hardwood or composite stage flooring mounted on frame
3 Side Safety Guard 1× Fixed or folding mesh safety barrier on platform sides
4 Rail Attachment Bracket 4× Bracket assemblies connecting platform to guide rails

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lift Platform Assembly

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Platform Frame understage-elevator-platform-frame 1× 1 · part
2 Platform Deck understage-elevator-platform-deck 1× 1 · part
3 Side Safety Guard understage-elevator-side-guard 1× 1 · part
4 Rail Attachment Bracket understage-elevator-platform-rail-mount 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the lift platform assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks