Supply Package Creel
AssemblyThe creel that holds the single-yarn supply packages, two or more per winding position, and the over-end unwinding accessories that let each end pay off at high speed without slough-off. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Supply Package Creel parts and their functions
4 top-level parts · 76 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Supply Package Holder | 24× | Supply package holders |
| 2 | Balloon Control Ring | 24× | Balloon control rings |
| 3 | Creel Support Rod | 4× | Creel support rods |
| 4 | Over-End Unwinding Guide | 24× | Over-end unwinding guides |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Supply Package Creel
4 top-level lines · 4 rows shown · 76 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Supply Package Holder | yarn-doubling-machine-package-holder | 24× | 24 | · | part |
| 2 | Balloon Control Ring | yarn-doubling-machine-balloon-control | 24× | 24 | · | part |
| 3 | Creel Support Rod | yarn-doubling-machine-creel-rod | 4× | 4 | · | part |
| 4 | Over-End Unwinding Guide | yarn-doubling-machine-unwind-guide | 24× | 24 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the supply package creel is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |