BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Supply Package Creel

Assembly

The creel that holds the single-yarn supply packages, two or more per winding position, and the over-end unwinding accessories that let each end pay off at high speed without slough-off. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Supply Package Creel parts and their functions

4 top-level parts · 76 parts in total · full bill of materials below
Supply Package Creel parts diagram: 1 supply package holder, 2 balloon control ring, 3 creel support rod, 4 over-end unwinding guide. 76 parts in 4 top-level items.
Supply Package Creel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Supply Package Holder 24× Supply package holders
2 Balloon Control Ring 24× Balloon control rings
3 Creel Support Rod 4× Creel support rods
4 Over-End Unwinding Guide 24× Over-end unwinding guides

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Supply Package Creel

4 top-level lines · 4 rows shown · 76 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Supply Package Holder yarn-doubling-machine-package-holder 24× 24 · part
2 Balloon Control Ring yarn-doubling-machine-balloon-control 24× 24 · part
3 Creel Support Rod yarn-doubling-machine-creel-rod 4× 4 · part
4 Over-End Unwinding Guide yarn-doubling-machine-unwind-guide 24× 24 · part

Something wrong in this list? Report a problem with this BOM.

Where the supply package creel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks