BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

You are viewing r192163 of this page, not the current version. Go to current · history

Machine Frame & Guards

Assembly

The welded steel frame that carries the winding positions in a row, the central suction duct that feeds every nozzle and cutter, the end drive, and the polycarbonate guards over the running parts. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Machine Frame & Guards

6 top-level lines as of r192163
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Welded Base Frame yarn-winding-machine-base-frame 1× 1 · part
2 Central Suction Duct yarn-winding-machine-suction-duct 1× 1 · part
3 Suction Blower 4 parts yarn-winding-machine-suction-blower 1× 1 0 assembly
4 End Drive Unit 4 parts yarn-winding-machine-end-drive 1× 1 0 assembly
5 Position Guard yarn-winding-machine-position-guard 8× 8 · part
6 Sheet Metal Panel sheet-panel 6× 6 · part