BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r4677 of this page, not the current version. Go to current · history

Deck Unit

Assembly

Above-deck base casting, mainshaft, and seals that carry the gypsy stack and pass the drive through the deck. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Deck Unit

6 top-level lines as of r4677
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Casting anchor-windlass-base-casting 1× 1 · part
2 Mainshaft anchor-windlass-mainshaft 1× 1 · part
3 Deck Seal anchor-windlass-deck-seal 1× 1 · part
4 Chain Pipe anchor-windlass-chain-pipe 1× 1 · part
5 Ball Bearing ball-bearing 2× 2 · part
6 O-Ring Set oring-set 1× 1 · part