Chilled-Water Pump
AssemblyCentrifugal pump circulating chilled water to the air handlers. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Chilled-Water Pump parts and their functions
4 top-level parts · 28 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Servo Motor 4 parts | 1× | Brushless motor with an integrated encoder or resolver, driven in closed loop to hold commanded position, speed, or torque precisely. |
| 2 | Pump Impeller | 1× | Centrifugal impeller moving chilled water. |
| 3 | Ball Bearing | 2× | Deep-groove radial ball bearing. |
| 4 | Oil Seal | 1× | Spring-loaded rotary lip seal that keeps lubricant inside a housing and dirt out where a shaft passes through, sized to DIN 3760. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Chilled-Water Pump
4 top-level lines · 15 rows shown · 28 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Servo Motor 4 parts | servo-motor | 1× | 1 | 24 | assembly |
| 1.1 | Stator Assembly 3 parts | stator-assembly | 1× | 1 | 3 | assembly |
| 1.1.1 | Stator Core (laminations) | stator-core | 1× | 1 | · | part |
| 1.1.2 | Copper Winding | copper-winding | 1× | 1 | · | part |
| 1.1.3 | Slot Insulation | stator-insulation | 1× | 1 | · | part |
| 1.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 1 | 19 | assembly |
| 1.2.1 | Rotor Shaft | rotor-shaft | 1× | 1 | · | part |
| 1.2.2 | Rotor Core | rotor-core | 1× | 1 | · | part |
| 1.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 16 | · | part |
| 1.2.4 | Ball Bearing | ball-bearing | 1× | 1 | · | part |
| 1.3 | Encoder | encoder | 1× | 1 | · | part |
| 1.4 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 2 | Pump Impeller | catamaran-ferry-pump-impeller | 1× | 1 | · | part |
| 3 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 4 | Oil Seal | oil-seal | 1× | 1 | · | part |
Where the chilled-water pump is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |