Aeration & Fluidising System
AssemblyLow-pressure air blowers, valves and air-slide channels that loosen the settled cement into a flowing, aerated bed so it can be moved without mechanical scraping of the whole floor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Aeration & Fluidising System parts and their functions
6 top-level parts · 406 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Fluidising Blower 4 parts | 4× | Low-pressure fluidising blowers |
| 2 | Air Slide | 60× | Air-slide conveying channels |
| 3 | Aeration Valve | 80× | Sectional aeration control valves |
| 4 | Air Intake Filter | 8× | Intake air filters |
| 5 | Pressure Sensor | 30× | Plenum and line pressure transmitters |
| 6 | Servo Motor 4 parts | 8× | Blower drive motors |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Aeration & Fluidising System
6 top-level lines · 21 rows shown · 406 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fluidising Blower 4 parts | cement-carrier-ship-fluidising-blower | 4× | 4 | 9 | assembly |
| 1.1 | Blower Rotor | cement-carrier-ship-blower-rotor | 2× | 8 | · | part |
| 1.2 | Ball Bearing | ball-bearing | 4× | 16 | · | part |
| 1.3 | Oil Seal | oil-seal | 2× | 8 | · | part |
| 1.4 | Gearbox Housing | gearbox-housing | 1× | 4 | · | part |
| 2 | Air Slide | cement-carrier-ship-air-slide | 60× | 60 | · | part |
| 3 | Aeration Valve | cement-carrier-ship-aeration-valve | 80× | 80 | · | part |
| 4 | Air Intake Filter | cement-carrier-ship-air-filter | 8× | 8 | · | part |
| 5 | Pressure Sensor | pressure-sensor | 30× | 30 | · | part |
| 6 | Servo Motor 4 parts | servo-motor | 8× | 8 | 24 | assembly |
| 6.1 | Stator Assembly 3 parts | stator-assembly | 1× | 8 | 3 | assembly |
| 6.1.1 | Stator Core (laminations) | stator-core | 1× | 8 | · | part |
| 6.1.2 | Copper Winding | copper-winding | 1× | 8 | · | part |
| 6.1.3 | Slot Insulation | stator-insulation | 1× | 8 | · | part |
| 6.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 8 | 19 | assembly |
| 6.2.1 | Rotor Shaft | rotor-shaft | 1× | 8 | · | part |
| 6.2.2 | Rotor Core | rotor-core | 1× | 8 | · | part |
| 6.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 128 | · | part |
| 6.2.4 | Ball Bearing | ball-bearing | 1× | 8 | · | part |
| 6.3 | Encoder | encoder | 1× | 8 | · | part |
| 6.4 | Motor Housing | motor-housing | 1× | 8 | · | part |
Where the aeration & fluidising system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |