BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Lap Feed & Nipper

Assembly

The lap rollers that meter a wadding of fibre forward and the nipper that clamps its leading fringe so the comb can work it without pulling whole fibres through. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lap Feed & Nipper parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Lap Feed & Nipper parts diagram: 1 lap roller, 2 feed roller, 3 nipper, 4 cushion plate, 5 ball bearing. 9 parts in 5 top-level items.
Lap Feed & Nipper parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lap Roller 2× Lap unrolling rollers
2 Feed Roller 1× Feed roller
3 Nipper 1× Nipper assembly
4 Cushion Plate 1× Bottom cushion plate
5 Ball Bearing 4× Roller bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lap Feed & Nipper

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lap Roller combing-machine-lap-roller 2× 2 · part
2 Feed Roller combing-machine-feed-roller 1× 1 · part
3 Nipper combing-machine-nipper 1× 1 · part
4 Cushion Plate combing-machine-cushion-plate 1× 1 · part
5 Ball Bearing ball-bearing 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the lap feed & nipper is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks