BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Drafting System

Assembly

The heart of the machine: a three-over-three or four-over-four roller arrangement that grips the doubled slivers and pulls them out to a fraction of their fed thickness, with pressure-loaded top rollers and a high main draft in the front zone. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drafting System parts and their functions

8 top-level parts · 81 parts in total · full bill of materials below
Drafting System parts diagram: 1 bottom drafting roller, 2 top pressure roller, 3 top roller pressure arm, 4 draft change gearbox, 5 top roller clearer, 6 helical gear pair, 7 servo motor, 8 ball bearing. 81 parts in 8 top-level items.
Drafting System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bottom Drafting Roller 4× Bottom drafting rollers
2 Top Pressure Roller 4× Top pressure rollers
3 Top Roller Pressure Arm 1× Top roller pressure arm
4 Draft Change Gearbox 4 parts 1× Draft change gearbox
5 Top Roller Clearer 2× Top roller clearers
6 Helical Gear Pair 3× Roller drive gears
7 Servo Motor 4 parts 2× Drafting servo motors
8 Ball Bearing 8× Roller bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drafting System

8 top-level lines · 23 rows shown · 81 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bottom Drafting Roller draw-frame-bottom-roller 4× 4 · part
2 Top Pressure Roller draw-frame-top-roller 4× 4 · part
3 Top Roller Pressure Arm draw-frame-pressure-arm 1× 1 · part
4 Draft Change Gearbox 4 parts draw-frame-draft-gearbox 1× 1 11 assembly
4.1 Gearbox Housing gearbox-housing 1× 1 · part
4.2 Helical Gear Pair gear-pair 4× 4 · part
4.3 Ball Bearing ball-bearing 4× 4 · part
4.4 Oil Seal oil-seal 2× 2 · part
5 Top Roller Clearer draw-frame-clearer-roller 2× 2 · part
6 Helical Gear Pair gear-pair 3× 3 · part
7 Servo Motor 4 parts servo-motor 2× 2 24 assembly
7.1 Stator Assembly 3 parts stator-assembly 1× 2 3 assembly
7.1.1 Stator Core (laminations) stator-core 1× 2 · part
7.1.2 Copper Winding copper-winding 1× 2 · part
7.1.3 Slot Insulation stator-insulation 1× 2 · part
7.2 Rotor Assembly 4 parts rotor-assembly 1× 2 19 assembly
7.2.1 Rotor Shaft rotor-shaft 1× 2 · part
7.2.2 Rotor Core rotor-core 1× 2 · part
7.2.3 Neodymium Magnet neodymium-magnet 16× 32 · part
7.2.4 Ball Bearing ball-bearing 1× 2 · part
7.3 Encoder encoder 1× 2 · part
7.4 Motor Housing motor-housing 1× 2 · part
8 Ball Bearing ball-bearing 8× 8 · part

Where the drafting system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks