Electrical Power Plant
AssemblyGenerating sets and a heavy switchboard feeding the dredge-pump drives, jet-water pumps and hydraulics, which together dwarf the ship hotel load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Electrical Power Plant parts and their functions
6 top-level parts · 2,077 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Auxiliary Genset 6 parts | 3× | Auxiliary generating sets |
| 2 | Main Switchboard 4 parts | 1× | Main switchboard and dredge feeders |
| 3 | Dredge VFD Cabinet 5 parts | 4× | Dredge-pump variable-frequency drives |
| 4 | Distribution Transformer | 2× | Distribution transformers |
| 5 | Relay | 80× | Protection and changeover relays |
| 6 | Wire Bundle | 40× | Power and control cabling |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Electrical Power Plant
6 top-level lines · 34 rows shown · 2,077 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Auxiliary Genset 6 parts | dredger-ship-genset | 3× | 3 | 339 | assembly |
| 1.1 | Stator Assembly 3 parts | stator-assembly | 1× | 3 | 3 | assembly |
| 1.1.1 | Stator Core (laminations) | stator-core | 1× | 3 | · | part |
| 1.1.2 | Copper Winding | copper-winding | 1× | 3 | · | part |
| 1.1.3 | Slot Insulation | stator-insulation | 1× | 3 | · | part |
| 1.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 3 | 19 | assembly |
| 1.2.1 | Rotor Shaft | rotor-shaft | 1× | 3 | · | part |
| 1.2.2 | Rotor Core | rotor-core | 1× | 3 | · | part |
| 1.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 48 | · | part |
| 1.2.4 | Ball Bearing | ball-bearing | 1× | 3 | · | part |
| 1.3 | Cylinder Unit 6 parts | dredger-ship-engine-cylinder | 6× | 18 | 32 | assembly |
| 1.3.1 | Engine Piston | dredger-ship-piston | 1× | 18 | · | part |
| 1.3.2 | Cylinder Liner | dredger-ship-liner | 1× | 18 | · | part |
| 1.3.3 | Cylinder Head | dredger-ship-cyl-head | 1× | 18 | · | part |
| 1.3.4 | Fuel Injector | dredger-ship-injector | 1× | 18 | · | part |
| 1.3.5 | O-Ring Set | oring-set | 4× | 72 | · | part |
| 1.3.6 | Fastener Set | fastener-set | 24× | 432 | · | part |
| 1.4 | Crankshaft | dredger-ship-crankshaft | 1× | 3 | · | part |
| 1.5 | Ball Bearing | ball-bearing | 4× | 12 | · | part |
| 1.6 | Fastener Set | fastener-set | 120× | 360 | · | part |
| 2 | Main Switchboard 4 parts | dredger-ship-switchboard | 1× | 1 | 86 | assembly |
| 2.1 | Circuit Breaker | dredger-ship-breaker | 24× | 24 | · | part |
| 2.2 | Relay | relay | 40× | 40 | · | part |
| 2.3 | LCD Panel | lcd-panel | 2× | 2 | · | part |
| 2.4 | Wire Bundle | wire-bundle | 20× | 20 | · | part |
| 3 | Dredge VFD Cabinet 5 parts | dredger-ship-vfd-cabinet | 4× | 4 | 213 | assembly |
| 3.1 | Bare PCB | pcb-bare | 2× | 8 | · | part |
| 3.2 | IGBT Power Module | igbt-module | 6× | 24 | · | part |
| 3.3 | DC-Link Capacitor | dc-link-cap | 4× | 16 | · | part |
| 3.4 | Microcontroller | mcu | 1× | 4 | · | part |
| 3.5 | SMD Passive (R/C/L) | smd-passives | 200× | 800 | · | part |
| 4 | Distribution Transformer | dredger-ship-transformer | 2× | 2 | · | part |
| 5 | Relay | relay | 80× | 80 | · | part |
| 6 | Wire Bundle | wire-bundle | 40× | 40 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the electrical power plant is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |