Side Frames & Columns
AssemblyThe heavy cast side frames and tie columns that carry the roller journals and react the full nip load without spreading. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Side Frames & Columns parts and their functions
5 top-level parts · 22 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cast Side Frame | 2× | Cast side frames |
| 2 | Tie Column | 4× | Tie columns |
| 3 | Machine Bed | 1× | Machine bed |
| 4 | Journal Bearing Housing 2 parts | 6× | Journal bearing housings |
| 5 | Fastener Set | 3× | Frame hardware |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Side Frames & Columns
5 top-level lines · 7 rows shown · 22 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cast Side Frame | fabric-calendering-machine-side-frame | 2× | 2 | · | part |
| 2 | Tie Column | fabric-calendering-machine-tie-column | 4× | 4 | · | part |
| 3 | Machine Bed | fabric-calendering-machine-base-bed | 1× | 1 | · | part |
| 4 | Journal Bearing Housing 2 parts | fabric-calendering-machine-bearing-housing | 6× | 6 | · | part |
| 4.1 | Ball Bearing | ball-bearing | 1× | 6 | · | part |
| 4.2 | Oil Seal | oil-seal | 1× | 6 | · | part |
| 5 | Fastener Set | fastener-set | 3× | 3 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the side frames & columns is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |