Cooling Section
AssemblyA run of water-cooled drums after the oven that brings the cured web back near room temperature so the coating is set firm before it reaches the rewind and does not block on the roll. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cooling Section parts and their functions
6 top-level parts · 16 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chilled Cooling Drum | 3× | Chilled cooling drums |
| 2 | Water Chiller Unit | 1× | Water chiller unit |
| 3 | Rotary Water Union | 3× | Rotary water unions |
| 4 | Idler Roller | 2× | Wrap idler rollers |
| 5 | Ball Bearing | 6× | Drum bearings |
| 6 | O-Ring Set | 1× | Union seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cooling Section
6 top-level lines · 6 rows shown · 16 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chilled Cooling Drum | fabric-coating-machine-cooling-drum | 3× | 3 | · | part |
| 2 | Water Chiller Unit | fabric-coating-machine-chiller-unit | 1× | 1 | · | part |
| 3 | Rotary Water Union | fabric-coating-machine-rotary-union | 3× | 3 | · | part |
| 4 | Idler Roller | fabric-coating-machine-idler-roller | 2× | 2 | · | part |
| 5 | Ball Bearing | ball-bearing | 6× | 6 | · | part |
| 6 | O-Ring Set | oring-set | 1× | 1 | · | part |
Where the cooling section is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |