BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cloth Take-Up

Assembly

The take-up motion that draws woven cloth off the fell at the rate that sets pick density and winds it onto the cloth beam. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cloth Take-Up parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Cloth Take-Up parts diagram: 1 take-up roller, 2 cloth beam, 3 take-up gears, 4 ball bearing. 7 parts in 4 top-level items.
Cloth Take-Up parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Take-Up Roller 1× Sandpaper take-up roller
2 Cloth Beam 1× Cloth beam
3 Take-Up Gears 1× Take-up change gears
4 Ball Bearing 4× Take-up bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cloth Take-Up

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Take-Up Roller jacquard-loom-take-up-roller 1× 1 · part
2 Cloth Beam jacquard-loom-cloth-beam 1× 1 · part
3 Take-Up Gears jacquard-loom-take-up-gear 1× 1 · part
4 Ball Bearing ball-bearing 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the cloth take-up is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks