BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Emergency Shutdown System

Assembly

The cargo emergency-shutdown chain: fast-acting line valves, fusible and manual initiators, hydraulic power and a ship-shore link that halts transfer in seconds. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Emergency Shutdown System parts and their functions

5 top-level parts · 982 parts in total · full bill of materials below
Emergency Shutdown System parts diagram: 1 ESD valve, 2 ESD initiator, 3 hydraulic power unit, 4 control cabinet, 5 cable run. 982 parts in 5 top-level items.
Emergency Shutdown System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 ESD Valve 4 parts 8× Fast-closing ESD line valves
2 ESD Initiator 20× Manual call points and fusible plugs
3 Hydraulic Power Unit 5 parts 1× ESD valve hydraulic power pack
4 Control Cabinet 7 parts 2× ESD logic and ship-shore link cabinets
5 Cable Run 600× ESD field cabling

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Emergency Shutdown System

5 top-level lines · 33 rows shown · 982 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 ESD Valve 4 parts lng-esd-valve 8× 8 4 assembly
1.1 Cryogenic Valve lng-cryo-valve 1× 8 · part
1.2 Valve Actuator lng-valve-actuator 1× 8 · part
1.3 Solenoid Valve lng-solenoid-valve 1× 8 · part
1.4 Fastener Set fastener-set 1× 8 · part
2 ESD Initiator lng-esd-initiator 20× 20 · part
3 Hydraulic Power Unit 5 parts lng-hydraulic-power-unit 1× 1 122 assembly
3.1 Engine Service Pump 5 parts lng-engine-pump 2× 2 7 assembly
3.1.1 Pump Casing lng-pump-casing 1× 2 · part
3.1.2 Pump Impeller lng-pump-impeller 1× 2 · part
3.1.3 Ball Bearing ball-bearing 2× 4 · part
3.1.4 Oil Seal oil-seal 2× 4 · part
3.1.5 Fastener Set fastener-set 1× 2 · part
3.2 Hydraulic Accumulator lng-hydraulic-accumulator 2× 2 · part
3.3 Hydraulic Reservoir lng-hydraulic-reservoir 1× 1 · part
3.4 Control Cabinet 7 parts lng-control-cabinet 1× 1 104 assembly
3.4.1 Bare PCB pcb-bare 6× 6 · part
3.4.2 Microcontroller mcu 2× 2 · part
3.4.3 SMD Passive (R/C/L) smd-passives 40× 40 · part
3.4.4 Relay relay 24× 24 · part
3.4.5 Connector connector 30× 30 · part
3.4.6 Wire Bundle wire-bundle 1× 1 · part
3.4.7 Cabinet Enclosure lng-cabinet-enclosure 1× 1 · part
3.5 Fastener Set fastener-set 1× 1 · part
4 Control Cabinet 7 parts lng-control-cabinet 2× 2 104 assembly
4.1 Bare PCB pcb-bare 6× 12 · part
4.2 Microcontroller mcu 2× 4 · part
4.3 SMD Passive (R/C/L) smd-passives 40× 80 · part
4.4 Relay relay 24× 48 · part
4.5 Connector connector 30× 60 · part
4.6 Wire Bundle wire-bundle 1× 2 · part
4.7 Cabinet Enclosure lng-cabinet-enclosure 1× 2 · part
5 Cable Run lng-cable-run 600× 600 · part

Something wrong in this list? Report a problem with this BOM.

Where the emergency shutdown system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks