Cargo Pump Tower
AssemblyTripod of stainless piping hung from the liquid dome carrying cargo and spray pumps, filling line and instrumentation to the tank bottom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Pump Tower parts and their functions
7 top-level parts · 2,631 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Submerged Cargo Pump 5 parts | 2× | Submerged main discharge pumps |
| 2 | Spray / Stripping Pump 5 parts | 1× | Spray/stripping pump for cooldown and gas generation |
| 3 | Tower Pipe Section | 120× | Stainless discharge, filling and emergency well piping |
| 4 | Tower Clamp | 90× | Tripod node clamps and pipe guides |
| 5 | Custody-Transfer Level Gauge | 2× | Float and radar custody-transfer level gauges |
| 6 | Emergency Pump Well | 1× | Foot valve and well for an emergency pump |
| 7 | Flange Bolt Set Item | 2400× | Tower flange bolting and U-bolts |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Pump Tower
7 top-level lines · 17 rows shown · 2,631 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Submerged Cargo Pump 5 parts | lng-cargo-pump | 2× | 2 | 6 | assembly |
| 1.1 | Pump Impeller | lng-pump-impeller | 1× | 2 | · | part |
| 1.2 | Submerged Pump Motor | lng-submerged-motor | 1× | 2 | · | part |
| 1.3 | Ball Bearing | ball-bearing | 2× | 4 | · | part |
| 1.4 | Pump Casing | lng-pump-casing | 1× | 2 | · | part |
| 1.5 | Fastener Set | fastener-set | 1× | 2 | · | part |
| 2 | Spray / Stripping Pump 5 parts | lng-spray-pump | 1× | 1 | 6 | assembly |
| 2.1 | Pump Impeller | lng-pump-impeller | 1× | 1 | · | part |
| 2.2 | Submerged Pump Motor | lng-submerged-motor | 1× | 1 | · | part |
| 2.3 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 2.4 | Pump Casing | lng-pump-casing | 1× | 1 | · | part |
| 2.5 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3 | Tower Pipe Section | lng-tower-pipe-section | 120× | 120 | · | part |
| 4 | Tower Clamp | lng-tower-clamp | 90× | 90 | · | part |
| 5 | Custody-Transfer Level Gauge | lng-level-gauge | 2× | 2 | · | part |
| 6 | Emergency Pump Well | lng-emergency-pump-well | 1× | 1 | · | part |
| 7 | Flange Bolt Set Item | lng-flange-bolt | 2400× | 2,400 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cargo pump tower is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |