Auxiliary Machinery & Shafting
AssemblyGenerating sets, the steam boilers that drive the cargo pumps, the shaft line, propeller and steering gear. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Auxiliary Machinery & Shafting parts and their functions
7 top-level parts · 1,084 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Auxiliary Genset 6 parts | 3× | Medium-speed auxiliary gensets |
| 2 | Boiler | 2× | Oil-fired cargo and service boilers |
| 3 | Centrifugal Purifier | 4× | Fuel and lube-oil purifiers |
| 4 | Propeller | 1× | Monobloc nickel-aluminium-bronze fixed-pitch propeller, ~9-10 m diameter on a VLCC. |
| 5 | Shaft Line 5 parts | 1× | Intermediate shaft, propeller shaft, stern tube |
| 6 | Rudder | 1× | Semi-spade rudder hung on a forged rudder stock behind the propeller. |
| 7 | Steering Gear | 1× | Hydraulic ram or rotary-vane machine turning the heavy rudder stock within the SOLAS time limit. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Auxiliary Machinery & Shafting
7 top-level lines · 31 rows shown · 1,084 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Auxiliary Genset 6 parts | oil-tanker-ship-genset | 3× | 3 | 356 | assembly |
| 1.1 | Stator Assembly 3 parts | stator-assembly | 1× | 3 | 3 | assembly |
| 1.1.1 | Stator Core (laminations) | stator-core | 1× | 3 | · | part |
| 1.1.2 | Copper Winding | copper-winding | 1× | 3 | · | part |
| 1.1.3 | Slot Insulation | stator-insulation | 1× | 3 | · | part |
| 1.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 3 | 19 | assembly |
| 1.2.1 | Rotor Shaft | rotor-shaft | 1× | 3 | · | part |
| 1.2.2 | Rotor Core | rotor-core | 1× | 3 | · | part |
| 1.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 48 | · | part |
| 1.2.4 | Ball Bearing | ball-bearing | 1× | 3 | · | part |
| 1.3 | Coolant Pump | coolant-pump | 2× | 6 | · | part |
| 1.4 | Genset Cylinder Unit 6 parts | oil-tanker-ship-genset-cylinder | 6× | 18 | 28 | assembly |
| 1.4.1 | Genset Piston | oil-tanker-ship-genset-piston | 1× | 18 | · | part |
| 1.4.2 | Genset Liner | oil-tanker-ship-genset-liner | 1× | 18 | · | part |
| 1.4.3 | Genset Cylinder Head | oil-tanker-ship-genset-head | 1× | 18 | · | part |
| 1.4.4 | Genset Injector | oil-tanker-ship-genset-injector | 1× | 18 | · | part |
| 1.4.5 | O-Ring Set | oring-set | 4× | 72 | · | part |
| 1.4.6 | Fastener Set | fastener-set | 20× | 360 | · | part |
| 1.5 | Ball Bearing | ball-bearing | 4× | 12 | · | part |
| 1.6 | Fastener Set | fastener-set | 160× | 480 | · | part |
| 2 | Boiler | oil-tanker-ship-boiler | 2× | 2 | · | part |
| 3 | Centrifugal Purifier | oil-tanker-ship-purifier | 4× | 4 | · | part |
| 4 | Propeller | oil-tanker-ship-propeller | 1× | 1 | · | part |
| 5 | Shaft Line 5 parts | oil-tanker-ship-shaft-line | 1× | 1 | 7 | assembly |
| 5.1 | Intermediate Shaft | oil-tanker-ship-intermediate-shaft | 1× | 1 | · | part |
| 5.2 | Propeller Shaft | oil-tanker-ship-prop-shaft | 1× | 1 | · | part |
| 5.3 | Stern Tube | oil-tanker-ship-stern-tube | 1× | 1 | · | part |
| 5.4 | Plummer Block Bearing | oil-tanker-ship-shaft-bearing | 2× | 2 | · | part |
| 5.5 | Oil Seal | oil-seal | 2× | 2 | · | part |
| 6 | Rudder | oil-tanker-ship-rudder | 1× | 1 | · | part |
| 7 | Steering Gear | oil-tanker-ship-steering-gear | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the auxiliary machinery & shafting is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |