BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Auxiliary Machinery & Shafting

Assembly

Generating sets, the steam boilers that drive the cargo pumps, the shaft line, propeller and steering gear. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Auxiliary Machinery & Shafting parts and their functions

7 top-level parts · 1,084 parts in total · full bill of materials below
Auxiliary Machinery & Shafting parts diagram: 1 auxiliary genset, 2 boiler, 3 centrifugal purifier, 4 propeller, 5 shaft line, 6 rudder, 7 steering gear. 1,084 parts in 7 top-level items.
Auxiliary Machinery & Shafting parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Auxiliary Genset 6 parts 3× Medium-speed auxiliary gensets
2 Boiler 2× Oil-fired cargo and service boilers
3 Centrifugal Purifier 4× Fuel and lube-oil purifiers
4 Propeller 1× Monobloc nickel-aluminium-bronze fixed-pitch propeller, ~9-10 m diameter on a VLCC.
5 Shaft Line 5 parts 1× Intermediate shaft, propeller shaft, stern tube
6 Rudder 1× Semi-spade rudder hung on a forged rudder stock behind the propeller.
7 Steering Gear 1× Hydraulic ram or rotary-vane machine turning the heavy rudder stock within the SOLAS time limit.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Auxiliary Machinery & Shafting

7 top-level lines · 31 rows shown · 1,084 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Auxiliary Genset 6 parts oil-tanker-ship-genset 3× 3 356 assembly
1.1 Stator Assembly 3 parts stator-assembly 1× 3 3 assembly
1.1.1 Stator Core (laminations) stator-core 1× 3 · part
1.1.2 Copper Winding copper-winding 1× 3 · part
1.1.3 Slot Insulation stator-insulation 1× 3 · part
1.2 Rotor Assembly 4 parts rotor-assembly 1× 3 19 assembly
1.2.1 Rotor Shaft rotor-shaft 1× 3 · part
1.2.2 Rotor Core rotor-core 1× 3 · part
1.2.3 Neodymium Magnet neodymium-magnet 16× 48 · part
1.2.4 Ball Bearing ball-bearing 1× 3 · part
1.3 Coolant Pump coolant-pump 2× 6 · part
1.4 Genset Cylinder Unit 6 parts oil-tanker-ship-genset-cylinder 6× 18 28 assembly
1.4.1 Genset Piston oil-tanker-ship-genset-piston 1× 18 · part
1.4.2 Genset Liner oil-tanker-ship-genset-liner 1× 18 · part
1.4.3 Genset Cylinder Head oil-tanker-ship-genset-head 1× 18 · part
1.4.4 Genset Injector oil-tanker-ship-genset-injector 1× 18 · part
1.4.5 O-Ring Set oring-set 4× 72 · part
1.4.6 Fastener Set fastener-set 20× 360 · part
1.5 Ball Bearing ball-bearing 4× 12 · part
1.6 Fastener Set fastener-set 160× 480 · part
2 Boiler oil-tanker-ship-boiler 2× 2 · part
3 Centrifugal Purifier oil-tanker-ship-purifier 4× 4 · part
4 Propeller oil-tanker-ship-propeller 1× 1 · part
5 Shaft Line 5 parts oil-tanker-ship-shaft-line 1× 1 7 assembly
5.1 Intermediate Shaft oil-tanker-ship-intermediate-shaft 1× 1 · part
5.2 Propeller Shaft oil-tanker-ship-prop-shaft 1× 1 · part
5.3 Stern Tube oil-tanker-ship-stern-tube 1× 1 · part
5.4 Plummer Block Bearing oil-tanker-ship-shaft-bearing 2× 2 · part
5.5 Oil Seal oil-seal 2× 2 · part
6 Rudder oil-tanker-ship-rudder 1× 1 · part
7 Steering Gear oil-tanker-ship-steering-gear 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the auxiliary machinery & shafting is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks