Piping Systems
AssemblyCargo, ballast, fuel, cooling, inert-gas and fire mains, the largest pipe population on the ship given the cargo and crude-wash networks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Piping Systems
5 top-level lines as of r116501| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pipe Spool | oil-tanker-ship-pipe-spool | 9000× | 9,000 | · | part |
| 2 | Pipe Flange | oil-tanker-ship-pipe-flange | 18000× | 18,000 | · | part |
| 3 | O-Ring Set | oring-set | 13000× | 13,000 | · | part |
| 4 | Pipe Valve | oil-tanker-ship-pipe-valve | 5000× | 5,000 | · | part |
| 5 | Pipe Hanger | oil-tanker-ship-pipe-hanger | 26000× | 26,000 | · | part |