Accommodation
AssemblyQuarters, mess and hospital for ~100 crew and scientists on 90-day endurance, fitted from prefabricated cabin modules. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Accommodation
6 top-level lines as of r129197| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cabin Module 2 parts | pib-cabin-module | 60× | 60 | 0 | assembly |
| 2 | Galley Block | pib-galley | 1× | 1 | · | part |
| 3 | HVAC Air Handler | pib-hvac-unit | 6× | 6 | · | part |
| 4 | Fire Door | pib-fire-door | 90× | 90 | · | part |
| 5 | Corridor Lining Panel | pib-corridor-panel | 700× | 700 | · | part |
| 6 | Fastener Set | fastener-set | 800× | 800 | · | part |