Bobbin Rail & Building Motion
AssemblyThe rail carrying all the bobbins and the building motion that raises and lowers it in shortening strokes while slowing it through the build, so the roving lays in tapered layers and the bobbin builds without ridges. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bobbin Rail & Building Motion parts and their functions
6 top-level parts · 75 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bobbin Rail | 1× | Bobbin rail |
| 2 | Roving Bobbin | 12× | Roving bobbins |
| 3 | Builder Motion Gearbox 4 parts | 1× | Builder motion gearbox |
| 4 | Rail Lift Screw | 2× | Rail lift screws |
| 5 | Cone Drum Drive | 1× | Cone drum drive |
| 6 | Servo Motor 4 parts | 2× | Rail and bobbin servos |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Bobbin Rail & Building Motion
6 top-level lines · 21 rows shown · 75 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bobbin Rail | roving-frame-rail | 1× | 1 | · | part |
| 2 | Roving Bobbin | roving-frame-bobbin | 12× | 12 | · | part |
| 3 | Builder Motion Gearbox 4 parts | roving-frame-builder-motion | 1× | 1 | 11 | assembly |
| 3.1 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 3.2 | Helical Gear Pair | gear-pair | 4× | 4 | · | part |
| 3.3 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 3.4 | Oil Seal | oil-seal | 2× | 2 | · | part |
| 4 | Rail Lift Screw | roving-frame-lift-screw | 2× | 2 | · | part |
| 5 | Cone Drum Drive | roving-frame-cone-drum | 1× | 1 | · | part |
| 6 | Servo Motor 4 parts | servo-motor | 2× | 2 | 24 | assembly |
| 6.1 | Stator Assembly 3 parts | stator-assembly | 1× | 2 | 3 | assembly |
| 6.1.1 | Stator Core (laminations) | stator-core | 1× | 2 | · | part |
| 6.1.2 | Copper Winding | copper-winding | 1× | 2 | · | part |
| 6.1.3 | Slot Insulation | stator-insulation | 1× | 2 | · | part |
| 6.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 2 | 19 | assembly |
| 6.2.1 | Rotor Shaft | rotor-shaft | 1× | 2 | · | part |
| 6.2.2 | Rotor Core | rotor-core | 1× | 2 | · | part |
| 6.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 32 | · | part |
| 6.2.4 | Ball Bearing | ball-bearing | 1× | 2 | · | part |
| 6.3 | Encoder | encoder | 1× | 2 | · | part |
| 6.4 | Motor Housing | motor-housing | 1× | 2 | · | part |
Where the bobbin rail & building motion is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |