Drafting Unit
AssemblyThe three- or four-line roller drafting unit, one per spindle, that pulls the heavy sliver out to roving fineness, with a double-apron middle zone that controls the floating fibers through the long high draft. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Drafting Unit parts and their functions
7 top-level parts · 22 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bottom Drafting Roller | 4× | Bottom drafting rollers |
| 2 | Top Pressure Roller | 4× | Top pressure rollers |
| 3 | Double Apron Pair | 1× | Double apron pair |
| 4 | Fiber Condenser | 2× | Fiber condensers |
| 5 | Roller Weighting Arm | 1× | Roller weighting arm |
| 6 | Helical Gear Pair | 2× | Roller drive gears |
| 7 | Ball Bearing | 8× | Roller bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Drafting Unit
7 top-level lines · 7 rows shown · 22 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bottom Drafting Roller | roving-frame-bottom-roller | 4× | 4 | · | part |
| 2 | Top Pressure Roller | roving-frame-top-roller | 4× | 4 | · | part |
| 3 | Double Apron Pair | roving-frame-apron-pair | 1× | 1 | · | part |
| 4 | Fiber Condenser | roving-frame-condenser | 2× | 2 | · | part |
| 5 | Roller Weighting Arm | roving-frame-weighting-arm | 1× | 1 | · | part |
| 6 | Helical Gear Pair | gear-pair | 2× | 2 | · | part |
| 7 | Ball Bearing | ball-bearing | 8× | 8 | · | part |
Where the drafting unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |