BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Beam Creel

Assembly

The stand of back beams whose sheets combine into one wide warp before the size box. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Beam Creel parts and their functions

5 top-level parts · 37 parts in total · full bill of materials below
Beam Creel parts diagram: 1 creel frame, 2 back beam, 3 beam brake, 4 tension bar, 5 ball bearing. 37 parts in 5 top-level items.
Beam Creel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Creel Frame 1× Creel frame
2 Back Beam 8× Back beams
3 Beam Brake 8× Beam brakes
4 Tension Bar 4× Tension bars
5 Ball Bearing 16× Beam bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Beam Creel

5 top-level lines · 5 rows shown · 37 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Creel Frame sizing-machine-textile-creel-frame 1× 1 · part
2 Back Beam sizing-machine-textile-back-beam 8× 8 · part
3 Beam Brake sizing-machine-textile-creel-brake 8× 8 · part
4 Tension Bar sizing-machine-textile-tension-bar 4× 4 · part
5 Ball Bearing ball-bearing 16× 16 · part

Where the beam creel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks