BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Refrigeration Plant

Assembly

Compressor and condenser plant supplying the freezers and the cold hold. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Refrigeration Plant parts and their functions

5 top-level parts · 27 parts in total · full bill of materials below
Refrigeration Plant parts diagram: 1 refrigeration compressor, 2 condenser, 3 coolant pump, 4 pressure sensor, 5 o-ring set. 27 parts in 5 top-level items.
Refrigeration Plant parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Refrigeration Compressor 3× Screw or reciprocating compressor circulating refrigerant for the freezing plant.
2 Condenser 2× Sea-water-cooled condenser rejecting the heat drawn from the frozen product.
3 Coolant Pump 2× Electric or belt-driven centrifugal pump that circulates coolant through the engine, motor, battery, or heat exchanger.
4 Pressure Sensor 8× Transduces fluid or gas pressure into an electrical signal.
5 O-Ring Set 12× Set of elastomer rings seated in grooves to seal static or slow-moving joints against fluid and gas, sized to ISO 3601.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Refrigeration Plant

5 top-level lines · 5 rows shown · 27 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Refrigeration Compressor stern-trawler-refrig-compressor 3× 3 · part
2 Condenser stern-trawler-condenser 2× 2 · part
3 Coolant Pump coolant-pump 2× 2 · part
4 Pressure Sensor pressure-sensor 8× 8 · part
5 O-Ring Set oring-set 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the refrigeration plant is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks